LPG Monteverde Terminal

Client: Flopec EP / Petroecuador
Location: Santa Elena, Ecuador
Year: 2012
Category: Marine Construction
Client: Flopec EP / Petroecuador
Location: Santa Elena, Ecuador
Year: 2012
Category: Marine Construction
Construction of the LPG Storage Terminal in Monteverde. It includes:
- Driving of 436 steel pipe piles 1,200 mm OD, and variable lengths from 35 to 52 m,
- Pouring more than 13,000 m3 of concrete.
- Construction of an Access Walkway 1,380m long and 12m wide, supported on 186 tubular steel piles.
- Construction of a 3000 m2 Operations Platform for the Unloading Arms.
- Construction of seven Mooring or Bearthing Dolphins.
- Installation of SCN Fender systems and Quick Release Hooks (QRH) and the Parallel docking aid system
Project executed in a consortium with Companía Cosntructora Belfi.