  • Construction of a 17 x 129 m concrete platform.
  • Construction of a acces bridge10.80 x 51.35 m.
  • Construction of 7 concrete blocks to support the fendering system;
  • Demolition and removal of the pre-existing surface and underwater salvage of suncken structures that interfered with the driving of the new piles and the construction of the new platform.

Including:

  • Provision and Driving of 23 piles 450 x 450 mm and between 24 and 30 m long ( the access walkway)
  • Provision and driving of 125 piles 600 x 600 mm between 24 and 35 m long (concrete platform)