Animal Feed Plant / Haid Feed

Client: Haid Feed
Location: Eloy Alfaro (Durán), Ecuador
Year: 2018
Category: Deep Foundations
Client: Haid Feed
Location: Eloy Alfaro (Durán), Ecuador
Year: 2018
Category: Deep Foundations
- Provision and Driving of 273 piles 400 x 400 mm and variable lengths between 19 m and 27,50 m;
- Provision and driving of 489 piles 500 x 500 mm and variable lengths between 16.50 and 27.50 m.
- Execution of 15 PDA Dynamic Load Tests.