Aerovía de Guayaquil

Client: Consorcio Aerosuspendido Guayaquil / Constructora SOFTSA
Location: Guayaquil, Ecuador
Year: 2019
Category: Marine Construction
Client: Consorcio Aerosuspendido Guayaquil / Constructora SOFTSA
Location: Guayaquil, Ecuador
Year: 2019
Category: Marine Construction
Pile Driving / general construction
- Procure and driving of 30 steel piles Ø800 x 25 mm;
- Procure and driving of 4 steel piles Ø1,200 x 25 mm
- Construction of the concrete blocks, for the support of the towers for the Guayaquil’s Aerovía (Tram) Project (Section over the Guayas river)
Installation of the Nautical (Soldier Piles) Fendering System
- Procurement and driving of 74 steel piles ø 2,500 mm, 1,500 mm and 20 m long;
- Procure and installation of 552 meters of steel tubular beams ø 800 mm e = 10 mm and connecting plates;
- Erection of all the bracing
- Execution of 7 PDA Tests